Prefab Workshop Industrial Shed Design Prefab Buildings
Products Show:
Prefab workshop is mainly composed of steel materials, prefab workshop is one of the main
building structure types. The main types of steel used are Q235 and Q345 in carbon steel, and 20mnvv for
high-strength bolts. The prefab workshop structure is mainly composed of steel beams, steel columns,
steel trusses and other components made of section steel and steel plates. The components or parts are usually
connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large
factories, stadiums, super high-rise buildings and other fields.

Main material

Company information

Workshop of steel structure

Certificate of steel structure

Our Advantage of steel structure:

Packing & Shipping of steel structure:
FAQ:
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods
are not in stock, it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000usd, 100% in advance. Payment>=1000usd,30% TT in advance,
balance before shippment. if you have another question, pls feel free to contact us.
Contacts

1. Grade: Q235,Q345,A36,SS400 S235jr...
2. Material: Mild steel,stainless steel,aluminum,brass
3. Heat treatment Normalization,annealing,quenching and tempering(45#)
4. Certification: SO9001:2008,DNV,GL,LR,ABC,BV,NK,KR,CCS.
Product Name | Low cost Prefab Building Materials Metal Steel Structure Poultry Farm House |
Material | Mild steel,stainless steel,aluminum,brass |
Color | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF,TIF , IGS , STP etc. |
Standard | DIN GB ISO JIS BA ANSI |
Grade | SUS201, SUS304, SUS316, A2-70, A2-80, A4-80, 4.8 6.8 8.8 10.9 12.9 |
Packing | ron pallets/racks, or as per customer's requirements. |
Software | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF,TIF , IGS , STP etc |
Application | Various sizes of vessles,Power stations, power plants, large generators,liftfork,material |
Products Show:
Prefab workshop is mainly composed of steel materials, prefab workshop is one of the main
building structure types. The main types of steel used are Q235 and Q345 in carbon steel, and 20mnvv for
high-strength bolts. The prefab workshop structure is mainly composed of steel beams, steel columns,
steel trusses and other components made of section steel and steel plates. The components or parts are usually
connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large
factories, stadiums, super high-rise buildings and other fields.

Main material

Company information

Workshop of steel structure

Certificate of steel structure

Our Advantage of steel structure:

Packing & Shipping of steel structure:
No | Description | Pictures showed |
1 | All of the steel column&beam ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment | ![]() |
2 | To make the loading and unloading more efficiently and saving the delivery cost, 40'container is preferred to loading the steel frames | ![]() |
3 | All the wall & roof panels will be filmed by two sides and fixed stably in the 40' HQ container | ![]() |
4 | All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container | ![]() |
FAQ:
Q: Are you trading company or manufacturer?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods
are not in stock, it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000usd, 100% in advance. Payment>=1000usd,30% TT in advance,
balance before shippment. if you have another question, pls feel free to contact us.
Contacts
